WORK: | Building Special Fruits | YEAR: | 2010 |
PLACE: | Alfeizerão, Alcobaça | AREA: | 2900 m² |
DESCRIPTION: | WEIGHT: | 130 t | |
Mixed building of steel-concrete in which the nave of the metallic structure, built with rolled profiles, is destined to fruit storage chambers. The coating of the metallic nave façade is made of corrugated sandwich panels and the office area is coated with plain panels. This was the first European work where a composite slab was used, in a mixed slab, with a span of 5m without a secondary metallic grid. |