WORK : | Marlis Pavillion | YEAR : | 2006 |
PLACE : | Leiria | AREA : | 2000 m² |
DESCRIPTION : | WEIGHT : | 70 t | |
Mixed building in steel-concrete. The metallic structure’s surface was treated by hot galvanization. The coating of the rounded area in the main façade was produced specifically for this work. The building is destined to the production of footwear. |