WORK: | Graça School | YEAR : | 2011 |
PLACE : | Coimbra | AREA : | 900 m² |
DESCRIPTION : | WEIGHT : | 40 t | |
Rehabilitation of 3 floors in metallic structure, prepared to support the coating. The entire structure is fireproof during 60 minutes. |
WORK: | Graça School | YEAR : | 2011 |
PLACE : | Coimbra | AREA : | 900 m² |
DESCRIPTION : | WEIGHT : | 40 t | |
Rehabilitation of 3 floors in metallic structure, prepared to support the coating. The entire structure is fireproof during 60 minutes. |