| WORK: | Graça School | YEAR : | 2011 |
| PLACE : | Coimbra | AREA : | 900 m² |
| DESCRIPTION : | WEIGHT : | 40 t | |
| Rehabilitation of 3 floors in metallic structure, prepared to support the coating. The entire structure is fireproof during 60 minutes. | |||
| WORK: | Graça School | YEAR : | 2011 |
| PLACE : | Coimbra | AREA : | 900 m² |
| DESCRIPTION : | WEIGHT : | 40 t | |
| Rehabilitation of 3 floors in metallic structure, prepared to support the coating. The entire structure is fireproof during 60 minutes. | |||