| WORK: | Battery 1 Galleries | YEAR : | 2012 |
| PLACE: | JunZKS Dillinger Hütte | AREA : | 1500 m² |
| DESCRIPTION : | WEIGHT: | 130 t | |
| Steel structure building that serves as a shelter for a steel industry furnace, built with refractory bricks. Outside galleries were built in two facades with railings in the upper zone. | |||

